Financial evaluation and public finances

Descripción:

Construction of a historical database of the municipal collections of the last 20 years, analysis of the peaks and valleys identified in the historical series, determining the causes of the behavior. Review, analysis and suggestions for modifications to the current system for calculating the aliquots and the tax base (i) for property taxes on real estate; (ii) for property taxes on motor vehicles; and (iii) for municipal patents. Analysis of the correlation between the income of the taxpaying population and the municipal tax burden, differentiating the analysis between natural persons and legal entities and between the different types of taxes and taxes. Comparative analysis of municipal tax burden with respect to other taxes (national) paid by both natural persons and legal entities.


Contratante:
GAMLP
Fecha Inicio:
2012-11-20
Fecha Fin:
2012-12-30
Descripción:

Economic and social evaluation of the Program and its components, based on the Shadow Prices methodology, taking the parameters Reason Price Efficiency Account (RPC) and social discount rate defined by the VIPFE, a sensitivity analysis of the financial profitability was carried out And social.


Contratante:
BID
Fecha Inicio:
2012-08-08
Fecha Fin:
2012-10-29
Descripción:

Socioeconomic evaluation of the Las Cholas Forum cultural project, an infrastructure that would cost an estimated US $ 7 million. It was evaluated as an urban development project (hedonic price model), as an alternative education project and as a cultural development project. 400 market surveys were applied to the population of the city of La Paz to configure the demand for artistic and cultural services in the city, as well as an analysis of the cultural offer of La Paz. A workshop was held with the ladies selling the Las Cholas market and with outstanding artists from the medium, including musicians, theater players, dancers and other cultural actors.


Contratante:
GMLP
Fecha Inicio:
2008-03-17
Fecha Fin:
2008-08-05
Descripción:

200 surveys to drivers of public transport of the city of Llallagua and 200 surveys of perception to users of public transport; 1 focal group with transporters; counts, gauging and spreads up / down in different points and routes of public transport. A Parametric Table of Vehicular Operation Costs and Rate Estimation for the Urban Public Transport of the city of Llallagua was built in the Trufis modality. A sensitivity analysis was carried out constructing scenarios with different values of the tariff according to the most representative and influential variables. A presentation of the study and training for the management and updating of the databases and tables parameterized to technicians of the Autonomous Municipal Government of Llallagua was made.


Contratante:
Municipal Autonomous Government of Llallagua
Fecha Inicio:
2014-05-12
Fecha Fin:
2014-06-11
Descripción:

200 surveys were carried out to drivers of public transport of the city of Oruro and 200 surveys of perception to users of public transport; 1 focal group with transporters; counts, gauging and spreads up / down in different points and routes of public transport. A Parametricized Table of Vehicular Operation Costs and Rate Estimation for Urban Public Transport of the city of Oruro was built in the modalities of minibuses and buses. A sensitivity analysis was carried out constructing scenarios with different values of the tariff according to the most representative and influential variables. A presentation of the study and training for the management and updating of the databases and tables parameterized to technicians of the Autonomous Municipal Government of Oruro was made.


Contratante:
Swisscontact
Fecha Inicio:
2013-11-15
Fecha Fin:
2014-01-14
Descripción:

Guidelines for a Business Plan for the first phase of the Municipal Transportation Service SETRAM, which will consist of the implementation of 4 semi-express public transport routes operated by a fleet of 61 buses (55 operative 6 reserve) of medium capacity (61 passengers) ). Social and Economic Impact Assessment of the SETRAM routes taking into account the environmental, social, anthropic and impact on mobility. Socioeconomic and financial evaluation of the first phase of the SETRAM, for which the social benefit derived from savings in waiting time and mobilization and savings in fuel was determined. The project was socioeconomically positive since it generates a high social benefit, however it must be subsidized by the GAMLP to guarantee its sustainability.


Contratante:
GAMLP
Fecha Inicio:
2012-12-14
Fecha Fin:
2013-01-29
Descripción:

Study on the cost of functioning of the DNA and administrative legal study of the powers and attributions conferred to the SEDEGES. Systematization and documentation of the Community Promoters strategy as a mechanism for universal access to the defense and protection of the rights of children, adolescents and the consolidation of DNAs, identifying good practices, lessons learned, institutional impact and impact on the community.


Contratante:
UNICEF
Fecha Inicio:
2011-11-18
Fecha Fin:
2012-11-05
Descripción:

Economic and financial evaluation of a sample of 84 productive projects implemented in rural areas of the municipalities of Charagua, Pailón, Minero, San Ignacio de Velasco and Concepción in the department of Santa Cruz; the projects consisted of providing productive capital (productive and livestock lands), training and technical assistance to productive associations formed by local families; The methodology of the evaluation included the application of participatory workshops with the associated families, reconstruction of investment structures, costs and income.


Contratante:
Ministry of Rural Development and Lands
Fecha Inicio:
2014-07-03
Fecha Fin:
2014-09-10
Descripción:

Comparative measurement of the effectiveness, costs and expenses of custodial measures, alternative measures to the deprivation of liberty (in an open environment) and the alternative model of Restorative Juvenile Justice. An analysis was made of the results of studies evaluating the cost-efficiency between deprivation of liberty and alternative measures to deprivation of liberty that have been carried out in Bolivia or in other countries; information was systematized on the budgets (costs and expenses) of the different programs (open or closed) applied to adolescents in conflict with the law; a cost-benefit analysis of the alternatives was made; Public policies and programs were proposed to implement the most efficient measures.


Contratante:
Ministry of Justice
Fecha Inicio:
2014-10-01
Fecha Fin:
2014-12-30
Descripción:

Financial and social economic evaluation of the new building of the Ministry of Finance in the city of La Paz; elaboration of private and socioeconomic financial cash flows, calculation of shadow prices, definition of indicators of private financial profitability and social profitability


Contratante:
Constec S.R.L. construction company
Fecha Inicio:
2014-07-21
Fecha Fin:
2014-08-20
Descripción:

Development of assumptions and methodologies for the economic and financial evaluation of the Public Expenditure Efficiency Support Program, with the purpose of quantifying the impacts in the improvement of the generation of resources and / or in the recovery of public resources, as well as in the saving public spending, building a cash flow and calculating profitability parameters (IRR and NPV).


Contratante:
BID
Fecha Inicio:
2013-05-16
Fecha Fin:
2013-06-26
Descripción:

Preparation of the Strategic Financial Plan (PEF) 2011-2021. Institutional strengthening. Analysis of expenditure levels by protected area and strategic area, analysis of sources and financing commitments. Elaboration of projections in various scenarios identifying needs and financing gaps. The PEF contemplates a new co-management mechanism for protected areas with the participation of community organizations in these areas.


Contratante:
SERNAP
Fecha Inicio:
2010-08-20
Fecha Fin:
2012-06-09
Descripción:

Financial balance at the national level of the provision of basic services (drinking water and basic sanitation) disaggregated by type of municipality and source of financing (GM and EPSAS) and projections on investment needs in water and sanitation through a new classification of municipalities made by the Bank. Analysis of management and financial capacities by type.


Contratante:
World Bank BM
Fecha Inicio:
2010-01-14
Fecha Fin:
2010-02-03
Descripción:

Preparation of a business plan at the pre-feasibility level for the implementation of a chain of coffee shops at the national level aimed at internal and external tourism, a study carried out for the company AGRICAVB SA. Local economic development.


Contratante:
Agricola Cafetalera Buena Vista Agricabv SA.
Fecha Inicio:
2007-08-16
Fecha Fin:
2007-10-10
Descripción:

Preparation of a business plan at pre-feasibility level for the implementation of a training center in microfinance in the city of Santa Cruz. Local economic development.


Contratante:
Fondo Financiero Privado Prodem SA
Fecha Inicio:
2007-07-17
Fecha Fin:
2007-10-09
Descripción:

An evaluation report preparation on the PDES 2016-2020 implementation  from the critical perspective of civil society, based on the different analysis documents and materials produced within the framework of the project: "Adding voices, multiplying actions: CSOs as actors in sustainable development and policies", among the main ones: participatory diagnoses, thematic studies, multi-actor political forums and proposals for public incidence.


Contratante:
UNITAS
Fecha Inicio:
2019-12-20
Fecha Fin:
2020-02-20